The Project Summary Report is located on the bottom left corner of the Details tab, and it is static, meaning it is always viewable when scrolling. The user can select the Project Summary Report (PSR) dropdown box to generate a PSR with a Funding Outlay table or a PSR with a Map. Depending on the user’s permissions, these will either display the full funding information/schedule or will only display “Funded for Preliminary Engineering” for projects with a Prioritization Status of “Will be Reprioritized” or “Not Funded.” Once the user selects an option, they can select the Open as PDF button to run the report. Project Summary Reports can be run on the Reports tab; however, the option to run it on the Details tab focuses the report on one project.
Comments
0 comments
Please sign in to leave a comment.